Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com

Traduction de «flight plan technical log » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
TRADUCTIONS EN CONTEXTE
In the exceptional case that an aircraft performs activities other than a flight, including undergoing major maintenance involving the emptying of the tanks, after the flight for which fuel consumption is being monitored, the aircraft operator may substitute the quantity ‘Amount of fuel contained in aircraft tanks once fuel uplift for subsequent flight is complete + Fuel uplift for that subsequent flight’ with the ‘Amount of fuel remaining in tanks at the start of the subsequent activity of the aircraft’, as recorded by technical logs ...[+++]

Dans le cas exceptionnel où, à l’issue du vol pour lequel la consommation de carburant est surveillée, un aéronef effectue des activités autres qu’un vol, notamment lorsqu’il fait l’objet d’importants travaux de maintenance nécessitant la vidange des réservoirs, l’exploitant d’aéronef peut remplacer la grandeur «Quantité de carburant contenue dans les réservoirs de l’aéronef après l’embarquement du carburant nécessaire au vol suivant + carburant embarqué pour ce vol suivant» par «Quantité de carburant restant dans les réservoirs au début de l’activité suivante de l’aéronef», telle que consignée dans les comptes rendus matériels.


(b) except where provided for by technical dispatch procedures required by subsection 706.06(1), the flight authority specified in the most recent journey log entry made pursuant to paragraph 571.06(3)(a) remains in effect until a new flight authority is specified.

b) d’autre part, sauf si le cas est prévu dans les procédures de remise en service technique exigées en vertu du paragraphe 706.06(1), l’autorité de vol correspondant à la plus récente inscription effectuée dans le carnet de route en vertu de l’alinéa 571.06(3)a) demeure en vigueur jusqu’à ce qu’une nouvelle autorité de vol y soit inscrite.


(4) Unless recorded in the operational flight plan or operational flight data sheet, the pilot-in-command of an aircraft engaged in a commercial air service and operating in international flight shall record in the journey log the following particulars in respect of each flight:

(4) À moins que les renseignements suivants concernant chacun des vols effectués ne soient inscrits dans le plan de vol exploitation ou la fiche de données de vol exploitation, le commandant de bord d’un aéronef utilisé dans le cadre d’un service aérien commercial en vol international doit les inscrire dans le carnet de route :


(g) aircraft log data and flight plans including identification as to purpose of flights;

g) données des journaux de bord et plans de vol des aéronefs, avec la mention du but des vols;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
46. When a non-scheduled aircraft is used for travel to the point of entry, the Technical Secretariat shall provide the inspected State Party with a flight plan, through the National Authority, for the flight of the aircraft from the last airfield prior to entering the airspace of that State Party to the point of entry, no less than six hours before the scheduled departure time from that airfield.

46. En cas d’utilisation d’un appareil effectuant des vols non réguliers pour assurer le déplacement jusqu’au point d’entrée, le Secrétariat technique fournit à l’État partie inspecté, par l’intermédiaire de l’autorité nationale, un plan de vol de l’aéronef entre le dernier aéroport avant la pénétration dans l’espace aérien de cet État partie et le point d’entrée, au moins six heures avant l’heure prévue pour le départ de cet aéroport.


The Technical Secretariat shall include in the remarks section of the flight plan the standing diplomatic clearance number and the appropriate notation identifying the aircraft as an inspection aircraft.

Le Secrétariat technique indique dans la section de chaque plan de vol consacrée aux observations le numéro permanent d’autorisation diplomatique et l’annotation appropriée désignant l’appareil comme appareil d’inspection.


2. Member States shall ensure that an archive of ATFM data listed in Article 6(5), flight plans, operational logs and relevant contextual data is created and maintained by the central unit for ATFM.

2. Les États membres veillent à ce qu’une archive contenant les données ATFM dont la liste figure à l’article 6, paragraphe 5, ainsi que les plans de vol, les registres d’exploitation et les données contextuelles pertinentes soit établie et tenue à jour par l’unité centrale d’ATFM.


2. Member States shall ensure that an archive of ATFM data listed in Article 6(5), flight plans, operational logs and relevant contextual data is created and maintained by the central unit for ATFM.

2. Les États membres veillent à ce qu’une archive contenant les données ATFM dont la liste figure à l’article 6, paragraphe 5, ainsi que les plans de vol, les registres d’exploitation et les données contextuelles pertinentes soit établie et tenue à jour par l’unité centrale d’ATFM.


3. Check of operational documentation (flight data, operational flight plan, technical log), and of flight preparation necessary to show that the flight is prepared in accordance with ICAO Annex 6.

3. Vérification des documents d'exploitation (données de vol, plan de vol d'exploitation, carnet technique) et de la préparation du vol permettant de prouver que le vol est préparé conformément à l'annexe 6 de la convention OACI.


1.2.1. One logon forward process shall be performed for each data-link logged-on flight planned to cross the boundary.

1.2.1. Une procédure de transmission d'identification est exécutée pour chaque vol prévoyant de franchir la limite dont l'identification est transmise par liaison de donnés.




D'autres ont cherché : ifr flight plan log     flight plan technical log     


datacenter (1): www.wordscope.fr (v4.0.br)

'flight plan technical log' ->

Date index: 2023-02-08
w