Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Dry field
Dry saturated steam
Dry saturated vapor
Dry steam
Dry steam coal
Dry steam field
Dry steam generation
Dry vapor
Fabrication of auxiliary heating plant
Heating wagon
LV dry steam coal
Low-volatility dry steam coal
Manufacturing of steam generators
Production of steam generators
Saturated dry steam
Steam dominated field
Steam electric plant
Steam generating station
Steam generator car
Steam generator unit
Steam generators manufacturing
Steam plant
Steam power plant
Steam power-plant
Steam-generating power plant
Thermal generating station
Thermal power station
Vapour dominated field

Traduction de «Dry steam generation » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous


dry steam coal | low-volatility dry steam coal | LV dry steam coal

maigres


fabrication of auxiliary heating plant | production of steam generators | manufacturing of steam generators | steam generators manufacturing

fabrication de générateurs de vapeur


dry saturated steam [ dry steam | dry vapor | dry saturated vapor ]

vapeur sèche [ vapeur saturée sèche | vapeur d'eau sèche ]


dry field | dry steam field | steam dominated field | vapour dominated field

champ à vapeur dominante | champ à vapeur sèche


steam generating station | steam power-plant | thermal generating station | thermal power station

centrale électrique thermique | centrale thermique | centrale thermoélectrique | usine thermique


steam generator car [ steam generator unit | heating wagon ]

fourgon-chaudière [ wagon de chauffage ]


steam electric plant [ steam power plant | steam-generating power plant | steam plant ]

centrale thermique à vapeur [ centrale à vapeur | usine à vapeur ]




TRADUCTIONS EN CONTEXTE
(2) A steam installation complying with Schedule III may be substituted for fire-smothering gas in any ship in which there are available boilers capable of generating 1 kg of steam per hour for each 0.75 m of the gross volume of the largest hold in the ship, or, in the case of a tanker, a foam installation, complying with Schedule III, may be substituted for fire-smothering gas except that foam shall not be used for dry cargo spaces.

(2) Une installation à vapeur conforme à l’annexe III pourra remplacer le gaz inerte sur tout navire disposant de chaudières sous pression pouvant produire 1 kg de vapeur par heure pour 0,75 m du volume brut de la plus grande cale ou, dans le cas d’un navire-citerne, une installation à mousse répondant aux prescriptions de l’annexe III pourra remplacer le gaz inerte, sauf que la mousse ne sera pas utilisée pour les locaux à marchandises sèches.


(2) A steam installation complying with Schedule III may be substituted for fire-smothering gas in any tanker in which there are available boilers capable of generating 1 kg of steam per hour for each 0.75 m of the gross volume of the largest hold in the ship, or a foam installation complying with Schedule III may be substituted for fire-smothering gas except that foam shall not be used for dry cargo spaces.

(2) Une installation à vapeur conforme aux prescriptions de l’annexe III pourra remplacer le gaz inerte sur tout navire-citerne disposant de chaudières sous pression pouvant produire 1 kg de vapeur par heure pour 0,75 m du volume brut de la plus grande cale, ou une installation à mousse répondant aux prescriptions de l’annexe III pourra remplacer le gaz inerte, sauf que la mousse ne sera pas utilisée pour les locaux à marchandises sèches.


(2) A steam installation meeting the requirements of Schedule III may be substituted for fire-smothering gas in any tanker in which there are available boilers capable of generating 1 kg of steam per hour for each 0.75 m of the gross volume of the largest hold in the ship, or a foam installation meeting the requirements of Schedule III may be substituted for fire-smothering gas except that foam shall not be used for dry cargo spaces.

(2) Une installation à vapeur conforme aux prescriptions de l’annexe III pourra remplacer le gaz inerte sur tout navire-citerne disposant de chaudières sous pression pouvant produire 1 kg de vapeur par heure pour 0,75 m du volume brut de la plus grande cale, ou une installation à mousse satisfaisant aux prescriptions de l’annexe III pourra remplacer le gaz inerte, sauf que la mousse ne sera pas utilisée pour les locaux à marchandises sèches.


All processes directly or indirectly linked to the process units blast furnace, hot metal treatment units, blast furnace blowers, blast furnace hot stoves, basic oxygen furnace, secondary metallurgy units, vacuum ladles, casting units (including cutting), slag treatment unit, burden preparation, BF gas treatment unit, dedusting units, scrap pre-heating, coal drying for PCI, vessels preheating stands, casting ingots preheating stands, compressed air production, dust treatment unit (briquetting), sludge treatment unit (briquetting), steam injection in BF uni ...[+++]

Sont inclus tous les procédés directement ou indirectement liés aux unités de procédé: haut-fourneau, installations de traitement du métal liquide, soufflantes de hauts-fourneaux, production de vent chaud pour haut-fourneau (cowper), convertisseur à oxygène, unités de métallurgie secondaire, traitement sous vide de l’acier, installations de coulée continue (y compris l’oxycoupage), installations de traitement du laitier, préparation des matières premières, installation de traitement des gaz de haut-fourneau, installations de dépoussiérage, préchauffage des ferrailles, installations de séchage de charbon pour l’injection de charbon pulvéris ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
for electricity generation using dry steam or high enthalpy brine after flashing,

pour produire de l'électricité en mettant à profit la vapeur sèche ou la saumure naturelle de haute enthalpie après vaporisation instantanée,


w