Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Acreage
Aft CG limit
Aft center of gravity limit
Aft centre of gravity limit
Aft compartment
Aft hold
Aft hold door
Aft shroud
Aft-engined aeroplane
Aft-engined airplane
Area of holding
CG too far aft
Cat walk
Catwalk
Centre of gravity too far aft
Farm size
Fore and aft bridge
Fore and aft gangway
Fore-and-aft bridge
Sample and hold
Sample-and-hold service
Size of holding
Track and hold unit
Track and store unit

Traduction de «aft hold » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous




aft center of gravity limit | aft centre of gravity limit | aft CG limit

limite de centrage arrière


fore and aft bridge | fore-and-aft bridge | cat walk | catwalk | fore and aft gangway

passavant


fore-and-aft bridge [ fore and aft bridge | fore and aft gangway | catwalk | cat walk ]

passavant [ passerelle volante ]


centre of gravity too far aft | CG too far aft

centrage trop à l'arrière


area of holding [ acreage | size of holding | Farm size(ECLAS) ]

surface d'exploitation [ dimension de l'exploitation | superficie agricole | taille de l'exploitation ]


aft-engined aeroplane [ aft-engined airplane ]

avion à moteur arrière [ avion à moteurs arrière ]


aft shroud [ aft compartment ]

compartiment interne [ compartiment arrière ]


S/H | sample and hold | sample/hold | sample-and-hold service | track and hold unit | track and store unit

échantillonneur bloqueur
TRADUCTIONS EN CONTEXTE
262 (1) Subject to subsection (2), the master and chief mate of any sail training vessel or any other sailing vessel, of at least 60 gross tonnage or of at least 24 m in length, that is a passenger-carrying vessel shall hold a Fore and Aft Sailing Vessel, Unlimited endorsement or a Square Rig Sailing Vessel, Unlimited endorsement, depending on the vessel’s type of rig.

262 (1) Sous réserve du paragraphe (2), le capitaine et le premier officier de pont de tout bâtiment de formation en navigation à voile ou de tout autre bâtiment à voile d’une jauge brute d’au moins 60 ou d’une longueur d’au moins 24 m qui est un bâtiment transportant des passagers doivent être titulaires d’un visa de gréement aurique, illimité, ou d’un visa de gréement carré, illimité, selon le type de gréement du bâtiment.


(2) The master and chief mate of a vessel referred to in subsection (1) may hold, instead of the endorsements referred to in that subsection, a Fore and Aft Sailing Vessel, Seasonal (April 15 to November 1) endorsement or a Square Rig Sailing Vessel, Seasonal (April 15 to November 1) endorsement, depending on the vessel’s type of rig, if the vessel is used solely for seasonal operation from April 15 to November 1 of each year and does not engage on unlimited voyages or near coastal voyages, Class 1.

(2) Le capitaine et le premier officier de pont de tout bâtiment visé au paragraphe (1) peuvent être titulaires, au lieu des visas visés à ce paragraphe, d’un visa de gréement aurique, saisonnier du 15 avril au 1 novembre, ou d’un visa de gréement carré, saisonnier du 15 avril au 1 novembre, selon le type de gréement du bâtiment, si le bâtiment est utilisé uniquement de façon saisonnière du 15 avril au 1 novembre de chaque année et n’effectue ni voyage illimité ni voyage à proximité du littoral, classe 1.


Care shall be exercised in holding the T-bar and rocking the 3-D H machine to ensure that no inadvertent exterior loads are applied in a vertical or fore and aft direction.

En tenant la barre en T et en faisant tourner la machine 3-D H, s’assurer qu’aucune charge extérieure verticale ou d’avant en arrière n’est appliquée par inadvertance.




datacenter (1): www.wordscope.fr (v4.0.br)

'aft hold' ->

Date index: 2023-03-01
w