Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Approach end of runway
Approach end of the aerodrome
Approach end of the runway
Departure end of the runway

Traduction de «approach end the runway » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
approach end of runway

entrée de piste [ début de piste ]






approach end of the aerodrome

extrémité d'approche de l'aérodrome


departure end of the runway

extrémité départ de la piste
TRADUCTIONS EN CONTEXTE
When an aircraft which has been given clearance to land is completing its approach using atmospheric pressure at aerodrome elevation (QFE), the vertical position of the aircraft shall be expressed in terms of height above aerodrome elevation during that portion of its flight for which QFE may be used, except that it shall be expressed in terms of height above runway threshold elevation:

Si un aéronef qui a reçu la clairance d'atterrissage termine son approche en utilisant la pression atmosphérique à l'altitude de l'aérodrome (QFE), la position de cet aéronef dans le plan vertical est exprimée en fonction de la hauteur au-dessus du niveau de l'aérodrome pendant la partie du vol pour laquelle le QFE peut être utilisé; exceptionnellement elle est toutefois exprimée en fonction de la hauteur au-dessus du niveau du seuil de la piste:


When displayed in a signal area, or horizontally at the end of the runway or strip in use, a right-hand arrow of conspicuous colour (Figure A1-9) indicates that turns are to be made to the right before landing and after take-off.

Une flèche de couleur voyante (figure A1-9), dirigée vers la droite, placée sur l’aire à signaux ou disposée horizontalement à l’extrémité de la piste ou de la bande en service, indique que les virages doivent être exécutés à droite avant l’atterrissage et après le décollage.


(a) a surface abutting the end of the strip associated with runway approach 02 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an intersection with the outer surface; THENCE, such approach surface shall be contiguous to the outer surface to an intersection with an imaginary horizontal line drawn at right angles to the projected centre line and passing through the intersection of the East-West dividing line between the North East and South East Quarters of Section 21, TWP. 83, RGE. 18, W6M with the South Easterly limit of approach ...[+++]

a) une surface attenante à l’extrémité de la bande associée à l’approche de la piste 02 et constituée d’un plan, incliné à raison de 1 m dans le sens vertical contre 50 m dans le sens horizontal, qui s’élève jusqu’à son croisement avec la surface extérieure; DE LÀ, ladite surface d’approche doit être contiguë à la surface extérieure jusqu’à son croisement avec une ligne horizontale imaginaire tracée perpendiculairement au prolongement de l’axe de la bande et passant par l’intersection de la ligne de division est-ouest des quartiers n ...[+++]


(c) a surface abutting the end of the strip associated with runway approach 11 consisting of an inclined plane having a ratio of 1 m measured vertically to 50 m measured horizontally rising to an intersection with the outer surface; THENCE, such approach shall be horizontal and contiguous to the outer surface to an intersection with an imaginary horizontal line drawn at right angles to the projected centre line and passing through the intersection of the Easterly limit of Section 8, TWP. 84, RGE. 18, W6M with the South Westerly limit of the approach surface to Runway 11; THENCE, said approach s ...[+++]

c) une surface attenante à l’extrémité de la bande associée à l’approche de la piste 11 et constituée d’un plan, incliné à raison de 1 m dans le sens vertical contre 50 m dans le sens horizontal, qui s’élève jusqu’à son croisement avec la surface extérieure; DE LÀ, ladite surface d’approche doit être horizontale et contiguë à la surface extérieure jusqu’à son croisement avec une ligne horizontale imaginaire tracée perpendiculairement au prolongement de l’axe de la bande et passant par l’intersection de la limite est de la section 8, ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(b) the strip associated with runway 08R-26L is 500 feet in width, 250 feet being on each side of the centre line of the runway and 4,300 feet in length, 200 feet extending beyond the end of runway approach 08R and 600 feet extending beyond the end of runway approach 28L;

b) la bande associée à la piste 08R-26L mesure 500 pieds de largeur, soit 250 pieds de chaque côté de l’axe de la piste, et 4 300 pieds de longueur, soit 200 pieds au-delà de l’extrémité de l’approche de la piste 08R et 600 pieds au-delà de l’extrémité de l’approche de la piste 28L;


(a) the take-off/approach surface abutting the end of the strip surface associated with the approach to proposed runway 09, consisting of an inclined surface having a ratio of 1 m measured vertically to 60 m measured horizontally rising to an imaginary line drawn at right angles to the projected centre line of the strip surface and distant 3 000 m measured horizontally from the end of the strip surface; thence continuing upward at a ratio of 1 m measured vertically to 50 m measured horizontally, rising to the outer edge of the take-o ...[+++]

a) la surface de décollage/d’approche attenante à l’extrémité de la surface de bande associée à l’approche de la piste proposée 09 consiste en une surface inclinée à raison de 1 m suivant la verticale pour 60 m suivant l’horizontale jusqu’à une ligne imaginaire tracée à angle droit par rapport au prolongement de l’axe de la surface de bande et à une distance suivant l’horizontale de 3 000 m à partir de l’extrémité de la surface de bande; de là, elle se prolonge vers le haut à raison de 1 m suivant la verticale pour 50 m suivant l’horizontale jusqu’à la limite extérieure de la surface de décollage/d’approche tracée à angle droit par rapp ...[+++]


(b) the take-off/approach surface abutting the end of the strip surface associated with the approach to proposed runway 27, consisting of an inclined surface having a ratio of 1 m measured vertically to 60 m measured horizontally rising to an imaginary line drawn at right angles to the projected centre line of the strip surface and distant 3 000 m measured horizontally from the end of the strip surface; thence continuing upward at a ratio of 1 m measured vertically to 50 m measured horizontally, rising to the outer edge of the take-o ...[+++]

b) la surface de décollage/d’approche attenante à l’extrémité de la surface de bande associée à l’approche de la piste proposée 27 consiste en une surface inclinée à raison de 1 m suivant la verticale pour 60 m suivant l’horizontale jusqu’à une ligne imaginaire tracée à angle droit par rapport au prolongement de l’axe de la surface de bande et à une distance suivant l’horizontale de 3 000 m à partir de l’extrémité de la surface de bande; de là, elle se prolonge vers le haut à raison de 1 m suivant la verticale pour 50 m suivant l’horizontale jusqu’à la limite extérieure de la surface de décollage/d’approche tracée à angle droit par rapp ...[+++]


Descriptions of airport developments, if any, already approved and in the pipeline, for example, increased capacity, runway and/or terminal expansion, approach and take-off forecasts, projected future traffic mix and estimated growth and a detailed study of the noise impact on the surrounding area caused by expanding the capacity, runways and terminals and by modifying flight paths and approach and take-off routes.

Descriptions des aménagements aéroportuaires, le cas échéant, déjà approuvés et prévus, concernant par exemple l’augmentation de la capacité, l’extension des pistes et/ou des terminaux, les prévisions d’approches et de décollages, la composition future et la prévision de croissance du trafic, et une étude détaillée des répercussions des nuisances sonores que cette augmentation de la capacité, cette extension des pistes et/ou des terminaux, et cette modification des trajectoires de vol, d’approche et de décollage ont sur les zones environnantes.


The type of runway, either runway for airplanes or final approach and take off area (FATO) for helicopters.

Le type de piste, c'est-à-dire soit une piste pour les avions, soit une aire d'approche finale et de décollage (FATO - final approach and take off area) pour les hélicoptères.


They could also permit greater flexibility in the design of approach and departure routes in order to reduce noise impact or to permit the completely safe use of more closely spaced airports or runways.

Ils pourraient également permettre plus de souplesse dans la conception des routes d'approche et de départ afin de réduire les nuisances sonores ou de permettre l'exploitation en toute sécurité d'aéroports ou de pistes plus rapprochés.




datacenter (1): www.wordscope.fr (v4.0.br)

'approach end the runway' ->

Date index: 2022-01-07
w