Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Activities performed with ship deck equipment
Ambursen dam
Ambursen slab and buttress dam
Anchor deck
Auto deck
CRT based flight deck
CRT configured flight deck
Car deck
Card deck
Card pack
Cathode ray tube-based flight deck
Cathode ray tube-configured flight deck
Deck
Deck dam
Deck installer
Deck of cards
Ensure suitable quantity of deck equipment
Flat slab and buttress dam
Flat slab dam
Flat-deck buttress dam
Flat-deck dam
Flat-slab buttress dam
Flat-slab dam
Flat-slab deck dam
Fo'c'sle deck
Foc'sle deck
Forecastle deck
Functions of deck equipment on vessels
Functions of ship deck equipment
Functions of vessel deck equipment
Handle deck equipment
Hurricane deck
Install stage decks
Pack
Prepare deck equipment
Promenade deck
Set of cards
Set up stage deck
Set up stage decks
Setting up stage decks
Shade deck
Slab and buttress dam
Sun deck
Waggon deck

Traduction de «deck installer » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
deck installer

installateur de terrasses [ installatrice de terrasses ]


set up stage deck | setting up stage decks | install stage decks | set up stage decks

installer des estrades


activities performed with ship deck equipment | functions of ship deck equipment | functions of deck equipment on vessels | functions of vessel deck equipment

fonctions des équipements du pont d'un navire


ensure suitable quantity of deck equipment | handle deck equipment | ensure appropriate quantity and location of deck equipment | prepare deck equipment

préparer les équipements des ponts


cathode ray tube-based flight deck | cathode ray tube-configured flight deck | CRT based flight deck | CRT configured flight deck

poste de pilotage doté d'écrans


flat-slab dam [ flat slab dam | flat-slab deck dam | flat-slab buttress dam | flat slab and buttress dam | flat-deck dam | flat-deck buttress dam | slab and buttress dam | deck dam | Ambursen dam | Ambursen slab and buttress dam ]

barrage à dalles planes [ barrage à contreforts à dalle plane | barrage à contreforts et dalle plane | barrage à bouchure en dalle plane | barrage à contreforts minces | barrage du type Ambursen ]


forecastle deck [ foc'sle deck | fo'c'sle deck | anchor deck ]

pont de gaillard [ pont de gaillard d'avant | plage avant | pont teugue | pont avant | pont de la teugue ]


promenade deck | sun deck | shade deck | hurricane deck

pont promenade




card deck | card pack | deck | deck of cards | pack | set of cards

jeu de cartes | paquet de cartes
TRADUCTIONS EN CONTEXTE
(i) a manually operated sprinkler system for vehicular decks installed in accordance with paragraph 6(1)(b), or

(i) soit un raccordement à un système de diffuseurs à commande manuelle pour ponts à véhicules, installé conformément aux prescriptions de l’alinéa 6(1)b), ou


(2) Guards must be installed on the deck of every vessel and on every other elevated working area on which materials handling equipment is used to prevent the equipment from falling over the sides of the deck or area.

(2) Des dispositifs protecteurs sont installés sur le pont de chaque bâtiment et de toute autre surface de travail élevée sur lesquels est utilisé un appareil de manutention des matériaux afin d’empêcher celui-ci de tomber du bâtiment ou de la surface.


(2) Guards shall be installed on the deck of every drilling unit, production facility and elevated working area on which mobile equipment is used to prevent the equipment from falling over the sides of the deck or area.

(2) Des dispositifs protecteurs doivent être installés sur le pont de toute installation de forage, installation de production ou surface de travail élevée où un appareil mobile est utilisé, afin d’empêcher l’appareil de tomber par-dessus bord.


40. In every ship there shall be provided for the guidance of the master of the ship plans showing for each deck the sections of the ship enclosed by “A” Class divisions and the sections of the ship enclosed by “B” Class divisions, together with particulars of the fire alarm and fire detecting systems, sprinkler installations and fire extinguishing appliances provided in the ship, the means of entry into and exit from the various compartments and decks, and of the ship’s ventilating system, including in particular the positions of the ...[+++]

40. Sur tout navire, il y aura, pour la gouverne du capitaine, des plans faisant voir, pour chaque pont, les sections qui sont entourées par des cloisons type A et celles qui le sont par des cloisons type B, et montrant dans le détail les systèmes d’alerte et de détection d’incendie, les dispositifs d’extinction par pulvérisation d’eau et les extincteurs d’incendie, les moyens d’entrée et de sortie des divers compartiments et entreponts ainsi que le système de ventilation, y compris en particulier l’emplacement des registres et les numéros d’identité des ventilateurs desservant chaque section. Ces plans seront protégés par du verre ou au ...[+++]


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(2) Every helicopter deck that forms part of an offshore installation shall be in a location that is readily accessible to and from the dependent personnel accommodation of the installation.

(2) Tout hélipont faisant partie de l’installation au large des côtes doit être situé en un lieu facilement accessible à partir du logement du personnel connexe de l’installation.


The team led by the European Aviation Safety Agency is satisfied following physical inspection and/or document review, that: a) Flight deck seat harness retrofit on aircraft of types AN-12, AN-72 and YAK-40; b) Flight deck retrofit with quick donning masks on AN-12 (installation was ongoing on aircraft UR-11316 at the time of visit and reviewed by the team); c) Installation of EGPWS on the aircraft of types AN-12 and AN-140; d) Take-off performance charts for all runways currently being used for aircraft of types AN-12 and YAK-40.

Par inspection matérielle et/ou examen de documents, l'équipe conduite par l'AESA a pu s'assurer de: a) la mise en conformité des harnais de poste de pilotage sur les appareils de types AN-12, AN-72 et YAK-40; b) la mise en conformité des postes de pilotage avec masques à pose rapide sur les appareils de type AN-12 (l'installation était en cours sur les appareils UR-11316 au moment de la visite et a été examinée par l'équipe); c) l'installation d'EGPWS sur les appareils de types AN-12 et AN-140; d) la mise à disposition d'abaques de performances au décollage pour toutes les pistes actuellement utilisées par des appareils de types AN-1 ...[+++]


Boarding boats (such as seariders and RIBs), including installed equipment, engines, launching davits and cranes (inclusive of hydraulic systems and installation), changes to the main vessel in order to adapt to the boarding boats (such as reinforcement of the deck and superstructure);

Les bateaux d’embarquement [tels que seariders et RIB (bateaux gonflables)], y compris l’équipement installé, les moteurs, bossoirs et grues de lancement (y compris les systèmes hydrauliques et l’installation), les changements apportés au navire principal afin de l’adapter aux bateaux d’embarquement (comme le renforcement du pont et de la superstructure).


- the fixed fire-fighting installations on deck, whether they be foam or dry chemical or other as required by the product carried.

- installations fixes de lutte contre l'incendie se trouvant sur le pont, qu'il s'agisse de mousse ou de produit chimique en poudre ou d'un autre produit selon le produit transporté.


- The fixed fire-fighting installations on deck whether they be foam or dry chemical or other as required by the product carried.

- Installations fixes de lutte contre l'incendie se trouvant sur le pont, qu'il s'agisse de mousse ou de produit chimique en poudre ou d'un autre produit selon le produit transporté.


2.02.3. Water bulkheads extending to the deck or, in the absence of a deck, to the upper edge of the hull planking or plating must be installed as follows: (a) a collision bulkhead at an appropriate distance from the stem;

2.02.3. Des cloisons étanches s'élevant jusqu'au pont ou, à défaut de pont, jusqu'à l'arrête supérieure du bordé doivent être aménagées aux endroits suivants: a) une cloison d'abordage à une distance appropriée de l'avant;




datacenter (1): www.wordscope.fr (v4.0.br)

'deck installer' ->

Date index: 2021-09-30
w