Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
4-point bend test
4-point bending test
Bending test under third-point loading
Bending test under two-point loading
Brazilian test
Diametral compression test
Four-point bend test
Four-point bending test
Four-point load
Four-point loading
Four-point loading test
Low-load test point
Point-load strength
Splitting tensile test
Splitting test
Three-point bending test
Three-point loading test
Two-point load
Two-point loading

Traduction de «four-point loading test » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
four-point bending test | four-point loading test

essai de flexion en quatre points | test de déformation en quatre points


four-point load | four-point loading | two-point load | two-point loading

charge en deux points | charge en quatre points | sollicitation en deux points


four-point bending test [ 4-point bending test | four-point bend test | 4-point bend test ]

essai de flexion quatre points [ essai de flexion 4 points ]


three-point bending test | three-point loading test

essai de flexion en trois points


bending test under third-point loading | bending test under two-point loading

essai sous moment constant


splitting tensile test [ diametral compression test | point-load strength | Brazilian test | splitting test ]

essai de traction par fendage [ fendage | essai brésilien ]


TRADUCTIONS EN CONTEXTE
(ii) by a single point load at one of the P3 test locations on the tested portion of the horizontal member, as shown in Figure 2;

(ii) à l’un des points d’application P3 de la partie de la pièce horizontale qui est mise à l’essai, au moyen d’une seule charge ponctuelle, comme l’indique la figure 2;


Is there a lesson to be learned in Human Resources Development that can be applied to trying to hold managers accountable and to testing for competence, as suggested in your four points?

Cependant, vous contribuez à donner le ton à l'ensemble de la fonction publique. Y a-t-il une leçon à tirer de l'expérience de Développement des ressources humaines qui pourrait s'appliquer à l'obligation de rendre compte des gestionnaires et à la vérification de leurs compétences, comme vous le laissez entendre dans vos quatre points?


Customers at these four points loaded, between these stations, 2,100 cars in the last crop year.

Les clients à ces quatre stations de chargement ont chargé 2 100 wagons au cours de la dernière campagne agricole.


(f) without readjusting the mattress support, repeat the procedures set out in paragraphs (d) and (e), except that, at each of the mattress support mechanisms, allow the test load to fall at a point that, when measured from the geometric centre of the test load, is 150 mm from the innermost surfaces of the sides nearest the mattress support being tested, measured at the level of the upper surface of the sheet of polyurethane foam; and

f) sans rajuster le support du matelas, répéter les opérations visées aux alinéas d) et e), mais cette fois en laissant tomber, près de chaque mécanisme du support, le poids à un point qui, lorsqu’il est mesuré à partir du centre géométrique du poids, se situe à une distance de 150 mm des surfaces le plus à l’intérieur des côtés du lit les plus proches du support mis à l’essai, mesurée au niveau de la surface supérieure du morceau de mousse;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
during static test, at the point when the energy required is attained in each horizontal load test prescribed or in the overload test the force must be greater than 0,8 F;

pendant l’essai statique, au moment où l’énergie requise est atteinte dans chaque essai prescrit de charge horizontale ou dans l’essai de surcharge, la force doit être supérieure à 0,8 F;


A selection of the following manoeuvres shall be tested (at least two manoeuvres for the four points, including one in reverse gear):

Une sélection des manœuvres suivantes doit être testée (au moins deux manœuvres pour les quatre points réunis, dont une en marche arrière):


Over the same time period that Calgary-Edmonton dropped 15%, our system-wide load factor was down only four points. Overall, Canadians are flying, but they're choosing not to fly on short-haul routes, where the security charge can represent a de facto 20% tax on the ticket price.

Pendant la même période au cours de laquelle le coefficient de remplissage pour le trajet Calgary-Edmonton a diminué de 15 p. 100, notre coefficient de remplissage global n'a diminué que de 4 p. 100. En somme, les Canadiens prennent l'avion, mais ils ne choisissent pas les vols de courte durée, car la taxe sur la sécurité peut représenter en fait une taxe de 20 p. 100 sur le prix du billet.


(v) To obtain the eco-label, the total load point sum (P) for the product must not exceed four points.

v) Pour qu'un produit obtienne le label écologique, le nombre total de points P du produit ne doit pas dépasser quatre.


Four points of the selection procedure chosen, the intensity rating test, which is described in the ASTM (American Society for Testing and Materials), STP (Special Technical Publication) No 440, page 53, have been modified by:

La procédure de sélection retenue est celle décrite sous le titre de «The intensity rating test» (essai de classification d'intensité) dans les normes A.S.T.M (American Society for Testing and Materials Publication), S.T.P (Special Technical Publication) n° 440, page 53, modifiée sur quatre points:


1.3.4.The pendulum block shall be pulled back so that the height of its centre of gravity above that at the point of impact is given by one of the following two formulae, to be chosen according to the reference mass of the tractors subjected to the tests:H = 25 + 0,20 mt for tractors with a reference mass of less than 2 000 kilograms,H = 125 + 0,15 mt for tractors with a reference mass of more than 2 000 kilograms.The pendulum block must then be released so as to strike the protection structure.1.4.Crushing at the rearThe beam shall b ...[+++]

1.3.4.Le mouton pendule doit être tiré vers l'arrière de façon que la hauteur de son centre de gravité dépasse celle qu'il aura au point d'impact d'une valeur donnée par l'une des deux formules suivantes à choisir en fonction de la masse de référence des tracteurs soumis aux essais:H = 25 + 0,20 mt pour les tracteurs d'une masse de référence inférieure à 2 000 kg,H = 125 + 0,15 mt pour les tracteurs d'une masse de référence supérieure à 2 000 kg.On lâche ensuite le mouton pendule qui vient heurter le dispositif de protection.1.4.Écrasement à l'arrièreLa poutre doit être placée sur la (les) traverse(s) supérieure(s) la (les) plus à l'arri ...[+++]




datacenter (1): www.wordscope.fr (v4.0.br)

'four-point loading test' ->

Date index: 2023-03-08
w