Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Battery cage management
Battery farming
Battery keeping
Cage
Cage culture
Cage farming
Cage fish culture
Cage of building hoist
Cage rearing
Come-along hoist
Confinement system
HO hoist
Hand-operated hoist
Heave-HO hoist
Hoisting cage
In battery brooding
In cage brooding
Lever hoist
Lever ratchet hoist
Lever-operated hoist
Lift and lower shipments with hoists
Man cage man hoist
Mine cage
Net culture
Operate hoists
Pull-lift hoist
Pulley block with lever
Ratchet handle hoist
Ratchet hoist
Ratchet lever hoist
Screw hoist
Screw-geared chain hoist
Use hoisting equipment
Utilise hoists
Worm gear hoist
Worm-gear hoist
Worm-geared hoist

Traduction de «hoisting cage » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
cage [ hoisting cage | mine cage ]

cage d'extraction [ cage | cage de descente | cage de mine ]






lift and lower shipments with hoists | utilise hoists | operate hoists | use hoisting equipment

utiliser des palans




hand-operated hoist | heave-HO hoist | HO hoist

treuil de sauvetage à main


lever ratchet hoist | ratchet lever hoist | ratchet hoist | ratchet handle hoist | lever-operated hoist | lever hoist | pull-lift hoist | come-along hoist | pulley block with lever

palan à levier | palan à rochet | palan à levier à rochet


cage fish culture [ cage rearing | cage farming | cage culture | net culture ]

pisciculture en cage [ élevage en cages | élevage en cage | élevage en nasses ]


battery cage management | battery farming | battery keeping | cage rearing | confinement system | in battery brooding | in cage brooding

élevage en batterie | élevage en batteries | élevage en cages


worm gear hoist | worm-gear hoist | worm-geared hoist | screw-geared chain hoist | screw hoist

palan à vis sans fin | palan à vis | palan à chaîne à vis sans fin
TRADUCTIONS EN CONTEXTE
Builders hoists for persons and materials with vertically guided cages

Ascenseurs de chantier pour personnes et matériaux avec cages guidées verticalement


79 (1) The connecting attachments between a newly installed or newly cut hoist rope and a cage or trip and between the hoist rope and the drum shall be inspected by a qualified person before the hoist is used.

79 (1) La personne qualifiée inspecte les fixations d’un câble d’extraction récemment installé ou récemment coupé le reliant à une cage ou à un convoi et l’assujettissant au tambour avant l’utilisation de la machine d’extraction.


(2) The rope sample referred to in subsection (1) shall consist of at least 4 m of hoist rope cut from the end at which the hoist rope is attached to the cage or trip.

(2) L’échantillon visé au paragraphe (1) doit mesurer au moins 4 m et provenir de l’extrémité du câble d’extraction attachée à la cage ou au convoi.


(2) No hoist rope referred to in subsection (1) shall be used for the transportation of persons in a shaft unless two trial winds have been made with the cage or trip loaded to the maximum authorized load of the hoist.

(2) Il est interdit d’utiliser un câble d’extraction visé au paragraphe (1) pour le transport des personnes dans un puits, à moins que deux courses d’essai n’aient été effectuées avec une cage ou un convoi comportant la charge maximale autorisée de la machine d’extraction.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
(2) The rope sample referred to in subsection (1) shall consist of at least 4 m of hoist rope cut from the end at which the hoist rope is attached to the cage or trip.

(2) L’échantillon visé au paragraphe (1) doit mesurer au moins 4 m et provenir de l’extrémité du câble d’extraction attachée à la cage ou au convoi.


(2) Every employer shall ensure that a stationary platform from which a diver works, or any cage, basket or platform on or in which a diver is lowered to or raised from an underwater work place, and any associated hoisting devices and tackle,

(2) L’employeur veille à ce que toute plate-forme stationnaire d’où un plongeur travaille, toute cage, nacelle ou plate-forme servant à transporter le plongeur à destination ou en provenance d’un lieu de travail sous l’eau, ainsi que tous les appareils et accessoires de levage connexes :




datacenter (1): www.wordscope.fr (v4.0.br)

'hoisting cage' ->

Date index: 2024-03-29
w