Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Breech loading torpedo tube
Charge hole
Charge tube
Internal loading torpedo tube
LOT procedure
Load capacity
Load carrying capacity
Load characteristics
Load characteristics of an X-ray tube assembly
Load hole
Load on top
Load on top procedure
Load on top system
Load range
Load rating
Load tube
Load-carrying capacity
Load-on-top
Load-on-top method
Load-on-top procedure
Load-on-top system
Loading of a torpedo into a tube
Maximum design tyre load
Maximum load capacity
Maximum load rating
Maximum load-carrying capacity
Perform freight loading preparation
Prepare loading activity resources
Prepare resources for loading activities
Ready loading activity resources
Tire load capacity
Tire load rating
Tire rating
Tube load table
Tube loading
Tube rating characteristics
Tube-load characteristics

Traduction de «load tube » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
charge hole | charge tube | load hole | load tube

trou de charge


internal loading torpedo tube [ breech loading torpedo tube ]

tube intérieur


tube rating characteristics | tube-load characteristics

diagramme de charge


load characteristics | load characteristics of an X-ray tube assembly

caractéristiques de charge | caractéristiques de charge d'un émetteur radiogène


tire load capacity | load rating | maximum load rating | load capacity | maximum load capacity | maximum load-carrying capacity | tire rating | load range | tire load rating | load carrying capacity | load-carrying capacity | maximum design tyre load

capacité de charge | capacité de charge maximale | limite de charge | capacité nominale | capacité nominale maximale | charge nominale | charge nominale maximale | limite de charge nominale | charge maximale calculée par pneumatique




loading of a torpedo into a tube

mise au tube d'une torpille




load on top [ load-on-top | load on top procedure | load-on-top procedure | LOT procedure | load-on-top system | load on top system | load-on-top method ]

chargement sur résidus [ système de chargement sur résidus | méthode de chargement sur résidus | load on top | chargement sur résidu | chargement par dessus | chargement par le dessus | chargé en dessus ]


perform freight loading preparation | ready loading activity resources | prepare loading activity resources | prepare resources for loading activities

préparer des ressources pour les activités de chargement
TRADUCTIONS EN CONTEXTE
The like product is also used for construction purposes, for example for load-bearing, fence tubing, protection means and scaffoldings.

Le produit similaire est également utilisé à des fins de construction, par exemple comme éléments porteurs, pour la création de clôtures, comme moyens de protection et dans les échafaudages.


(2) For any combination of X-ray tube voltage, X-ray tube current and irradiation time, or for any selected exposure to the X-ray image receptor, when the line voltage for each measurement is accurate to within 1% of the mean line voltage value of all the measurements, and when all variable controls for the loading factors are adjusted to alternate settings and reset to the test setting before each measurement,

(2) Pour toute combinaison de la tension radiogène, du courant dans le tube radiogène et de la durée d’irradiation, ou pour toute exposition sélectionnée au récepteur d’image radiologique, lorsque la tension de secteur pour chaque mesure correspond à la valeur moyenne de la tension de toutes les mesures à 1 % près, et que toutes les commandes variables pour les paramètres de charge sont réglées à d’autres valeurs et ramenées à la valeur d’essai avant chaque mesure :


(g) the leakage radiation from the X-ray tube housing, when measured at a distance of 1 m from the target and averaged over an area of 100 cm having no linear dimension greater than 20 cm, does not exceed 25.8 microcoulombs per kilogram (100 milliroentgens) or 0.87 milligrays in any one-hour period under any combination of loading factors within the rated limits of use of the equipment.

g) aucun rayonnement de fuite en provenance de la gaine, mesuré à une distance de 1 m de la cible, ne dépasse en moyenne au cours d’une période d’une heure, pour toute surface de 100 cm n’ayant aucune dimension linéaire de plus de 20 cm, 25,8 microcoulombs par kilogramme (100 milliröntgens) ou 0,87 milligray pour toute combinaison des paramètres de charge à l’intérieur des limites d’utilisation de l’appareil.


The tube structure was meant to resist the lateral load.

C'était le rôle de la structure tubulaire.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
A steel tube shall be attached firmly to the trolley in such a way that a load of 5 000 ± 50 N applied horizontally to the centre of the tube does not cause a movement greater than 2 mm.

Un tube d’acier est solidement fixé au chariot de manière qu’une charge de 5 000 ± 50 N dirigée horizontalement au centre du tube ne provoque pas un déplacement de plus de 2 mm.


3.2.2. A steel tube shall be attached firmly to the trolley in such a way that a load of 5 000 ± 50 N applied horizontally to the centre of the tube does not cause a movement greater than 2 mm.

3.2.2. Un tube d’acier sera solidement attaché au chariot de manière qu’une charge de 5 000 ± 50 N dirigée horizontalement au centre du tube ne provoque pas un déplacement plus grand que 2 mm.


The pellets are loaded into zircaloy tubes about 50 centimetres long.

Ces pastilles sont placées dans des tubes de zircaloy d'environ 50 centimètres de longueur.


Quickly place a sample of 0 72 g weighed to the nearest mg in a test tube with a ground-glass stopper, add 10 ml of 0 71 N hydrochloric acid (3.1) and then 10 ml of urea loading agent (3.4).

Introduire rapidement et successivement dans un tube à essai à bouchon rodé une prise d'essai de 0,2 g, pesée à 1 mg près, 10 ml d'acide chlorhydrique 0,1 N (3.1) et 10 ml de solution tamponnée d'urée (3.4).


Crush about 10 g of the sample (for example in a coffee mill) so that it passes through a sieve with a mesh of 0 72 mm. Weigh out 0 72 g of the crushed sample to the nearest mg, place in a test tube with a ground-glass stopper and add 10 ml of urea loading agent (3.4).

Broyer (dans un moulin à café, par exemple) 10 g environ de l'échantillon de façon qu'il passe à travers un tamis à mailles de 0,2 mm. Dans un tube à essai à bouchon rodé, peser à 1 mg près, 0,2 g de l'échantillon broyé et ajouter 10 ml de solution tamponnée d'urée (3.4).


Mr. Ken Epp: What I'm hearing from farmers is that with the federal government subsidy and their transportation going down the tubes, combined with the loss of the railroads, they now have to either hire trucks or buy their own, and unless they are able to carry substantial loads their costs to get their product to market will simply drive them right out of business.

M. Ken Epp: D'après les nouvelles que j'ai des agriculteurs, parce que les subventions qu'ils reçoivent du gouvernement fédéral et leur moyen de transport sont en train de disparaître, ce à quoi s'ajoute maintenant la perte des chemins de fer, il leur faut maintenant louer des camions ou s'en acheter un et à moins de pouvoir transporter de gros chargements, le prix à payer pour rendre leurs produits au marché les mettra tout simplement sur la paille.


w