Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Complete a call
Establish a call
Fasten reinforcing strips to wooden vessel components
Fasten wood reinforcing strips to vessel components
Flow rate
Passage of a vessel through a lock
Pull rate
Put a vessel off-hire
Put a vessel through
Put through a call
Reinforce vessel components through using wood strips
Set up
Set up a call
Through put
To put a call through

Traduction de «put a vessel through » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous








passage of a vessel through a lock

passage d'écluse d'un bateau


attach firmly wood reinforcing strips to vessel components | fasten reinforcing strips to wooden vessel components | fasten wood reinforcing strips to vessel components | reinforce vessel components through using wood strips

fixer des bandes de renfort en bois aux éléments d’un navire


flow rate | pull rate | through put

tirée d'une filière




set up a call | complete a call | establish a call | put through a call | set up

établir une communication | obtenir une communication
TRADUCTIONS EN CONTEXTE
252 (1) At all MARSEC levels, security procedures shall be established in the vessel security plan, to the extent that they are appropriate to the vessel’s operations, to continuously monitor the vessel, the restricted areas on board the vessel and the area surrounding the vessel through a combination of lighting, watchkeepers, security guards, deck watches, automatic intrusion-detection devices, surveillance equipment and waterborne patrols.

252 (1) Des procédures de sûreté sont établies dans le plan de sûreté du bâtiment, à tous les niveaux MARSEC, compte tenu des opérations du bâtiment, visant la surveillance en permanence du bâtiment, des zones réglementées à bord et de la zone l’entourant au moyen d’une combinaison de dispositifs d’éclairage, de personnel de quart, des gardes chargés de la sûreté, de services de quart à la passerelle, de dispositifs de détection automatique des intrusions, de matériel de surveillance et de patrouilles sur l’eau.


13 (1) Exhaust pipes from the main engines and from auxiliary engines of a fishing vessel shall be permanently mounted and shall lead to the open air outside the vessel through the uppermost deck or canopy or through the side.

13 (1) Les tuyaux d’échappement des machines principales et des machines auxiliaires d’un bateau de pêche devront être montés en permanence et déboucher à l’air libre à l’extérieur du bateau après avoir traversé soit le pont ou le tendelet le plus élevé, soit le bordé.


34 (1) No person in charge of a vessel shall attempt to pass the vessel through the Brighton Road Swing Bridge, situated on Northumberland County Road Number 64 on the Murray Canal along the Trent-Severn Waterway, except in accordance with a permit issued under subsection (2).

34 (1) Le responsable d’un bâtiment ne peut tenter de lui faire franchir le pont tournant dit de la route Brighton situé sur la route n 64 dans le comté de Northumberland, sur le canal Murray de la voie navigable Trent-Severn, à moins de se conformer aux modalités du permis délivré en vertu du paragraphe (2).


33 (1) Subject to subsection (2) and section 34, no person in charge of a vessel in a historic canal shall attempt to pass the vessel through a swing or lift bridge until the bridge is fully open and

33 (1) Sous réserve du paragraphe (2) et de l’article 34, le responsable d’un bâtiment dans un canal historique ne peut tenter de lui faire franchir un pont tournant ou un pont levant avant que le pont ne soit en position ouverte et, selon le cas :


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
It will go under the system trials and evaluation systems that we will always put vessels through.

Il subira les tests et les évaluations auxquels nous soumettons toujours les navires.


(8) 'refuelling point for LNG' means a provision of LNG through a physically established pump connected to fixed or mobile installations (including vehicles and vessels), through a movable LNG container, or through other systems.

8) «point de ravitaillement en GNL»: un approvisionnement en GNL, par l’intermédiaire d’une pompe physiquement fixe reliée à des installations fixes ou mobiles (y compris des véhicules ou des navires), soit par l’intermédiaire d’un conteneur mobile de GNL, ou par d'autres systèmes.


assessment of the adequacy of the technical design of the vessel through examination of the technical documentation and supporting evidence referred to in point 1.3, plus examination of a prototype, representative of the production envisaged, of the complete vessel (production type);

évaluation de l'adéquation de la conception technique du récipient par un examen de la documentation technique et des preuves visées au point 1.3, plus examen d'un modèle, représentatif de la fabrication envisagée, du récipient complet (type de fabrication);


assessment of the adequacy of the technical design of the vessel through examination of the technical documentation and supporting evidence referred to in point 1 .3, without examination of a prototype vessel (design type).

évaluation de l'adéquation de la conception technique du récipient par un examen de la documentation technique et des preuves visées au point 1.3 , sans examen d'un modèle de récipient (type de conception).


assessment of the adequacy of the technical design of the vessel through examination of the technical documentation and supporting evidence, plus examination of a prototype, representative of the production envisaged, of the complete vessel ( Module B – production type).

évaluation de l'adéquation de la conception technique du récipient par un examen de la documentation technique et des preuves étayant ladite documentation, plus examen d'un modèle, représentatif de la fabrication envisagée, du récipient complet (module B – type de fabrication);


assessment of the adequacy of the technical design of the vessel through examination of the technical documentation and supporting evidence without examination of a specimen (Module B – design type);

évaluation de l'adéquation de la conception technique du récipient par un examen de la documentation technique et des preuves étayant ladite documentation, sans examen d'un exemplaire (module B – type de conception);




D'autres ont cherché : complete a call     establish a call     flow rate     pull rate     put a vessel off-hire     put a vessel through     put through a call     put through by closure to     set up     set up a call     through put     to put a call through     


datacenter (1): www.wordscope.fr (v4.0.br)

'put a vessel through' ->

Date index: 2023-06-13
w