Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
River power plant
River-run plant
Run-of-river generating station
Run-of-river hydro-electric power station
Run-of-river plant
Run-of-river power house
Run-of-river power plant
Run-of-river power station
Run-of-the-river hydroelectric plant
Run-of-the-river plant

Traduction de «run-of-river generating station » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
run-of-river plant | river-run plant | run-of-river generating station | run-of-river power station | run-of-river power plant

centrale au fil de l'eau | centrale hydroélectrique au fil de l'eau | usine au fil de l'eau


run-of-the-river hydroelectric plant [ run-of-the-river plant | run-of-river power plant | run-of-river power station | run-of-river power house | river-run plant | river power plant ]

centrale au fil de l'eau [ centrale hydroélectrique au fil de l'eau | centrale hydro-électrique au fil de l'eau | usine hydroélectrique au fil de l'eau | usine hydro-électrique au fil de l'eau | usine au fil de l'eau ]


river power plant | run-of-river power station

centrale au fil de l'eau | centrale hydro-électrique au fil de l'eau | usine au fil de l'eau


run-of-river hydro-electric power station

centrale hydraulique au fil d'eau
TRADUCTIONS EN CONTEXTE
Mr. LeClair: Our first project, the Black River Generating Station, the $24 million development that I told you about, was a province-wide RFP.

M. LeClair : Notre premier projet, la centrale électrique de Black River, un projet de 24 millions de dollars, a fait l'objet d'une demande de propositions qui a été diffusée dans l'ensemble de la province.


His name is Tom Mitchell. His immediate predecessor, Duncan Hawthorne, has presented to this committee, and also runs Bruce Nuclear Generating Station.

Son prédécesseur, Duncan Hawthorne — qui a aussi témoigné devant vous — dirige pour sa part la centrale nucléaire de Bruce.


11. The waters of the St. Lawrence River lying between the easterly boundary of the dam at the site of the Robert H. Saunders Generating Station; the waters in that part of the Cataraqui River (Rideau Canal) downstream of Kingston Mills Road (County Road 21) in the City of Kingston; and a line described as follows:

11. Les eaux du fleuve Saint-Laurent situées entre la limite est du barrage de la centrale hydroélectrique Robert H. Saunders; les eaux de la partie de la rivière Cataraqui (canal Rideau) en aval de la route de Kingston Mills (chemin de comté 21) dans la ville de Kingston et une ligne décrite comme suit :


The water catchment areas of the Adige river and its sources in the territory of the Autonomous Province of Trento, from the border with the Province of Bolzano to the Ala dam (hydroelectric generating station).

les bassins de drainage des eaux du fleuve Adige et ses sources sur le territoire de la province autonome de Trente, depuis la limite de la province de Bolzano jusqu’au barrage d’Ala (centrale hydroélectrique)


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
In addition to building and maintaining their own airport, the Tlicho people, in collaboration with the Northwest Territories Power Corporation, established a run-of-the-river hydro generating station on the Snare River-Snare Cascades.

En plus d'avoir construit et de maintenir leur propre aéroport, les Tlichos, en collaboration avec la Société d'énergie des Territoires du Nord-Ouest, ont construit une centrale au fil de l'eau sur la rivière Snare.


The water catchment areas of the Adige river and its sources located within the territory of the Autonomous Province of Trento, from the border with the Province of Bolzano to the dam of Ala (hydroelectric generating station).

Les bassins de drainage des eaux de la rivière Adige et de ses sources situées sur le territoire de la province autonome de Trente, depuis la limite de la province de Bolzano jusqu'au barrage d'Ala (centrale hydroélectrique).


A run of the river hydro generating station, for instance, was established years ago on the Snare River.

Une centrale au fil de l'eau a été érigée à Snare River il y a déjà plusieurs années.


- The water catchment areas of the Adige river and its sources located within the territory of the Autonomous Province of Trento, from the border with the Province of Bolzano to the dam of Ala (hydroelectric generating station).

- Les bassins de drainage des eaux de la rivière Adige et ses sources situées sur le territoire de la province autonome de Trente, depuis la limite de la province de Bolzano jusqu'au barrage de l'Ala (centrale hydroélectrique).


- the water catchment areas of the Adige river and its sources located within the territory of the Autonomous Province of Trento, from the border with the Province of Bolzano to the dam of Ala (hydroelectric generating station).

- Les bassins de drainage des eaux de la rivière Adige et ses sources situées sur le territoire de la province autonome de Trente, depuis la limite de la province de Bolzano jusqu'au barrage de l'Ala (centrale hydroélectrique)


- The water catchment areas of the Adige river and its sources located within the territory of the Autonomous Province of Trento, from the border with the Province of Bolzano to the dam of Ala (hydroelectric generating station)

- Les bassins de drainage des eaux de la rivière Adige et ses sources situées sur le territoire de la province autonome de Trente, depuis la limite de la province de Bolzano jusqu'au barrage de l'Ala (centrale hydroélectrique).




datacenter (1): www.wordscope.fr (v4.0.br)

'run-of-river generating station' ->

Date index: 2021-12-06
w