Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Boat NOS Ship NOS Watercraft NOS
Design drainage well systems
Designing drainage well systems
Drainage board
Drainage well system designing
Drainage well system installing
Drainage well systems commissioning
Drainage well systems specifying
Ensure drainage system in airport remains functional
Ferry-boat Liner
Greater Vancouver Sewerage and Drainage District
Hovercraft
Install drainage well systems
Installing drainage well systems
Internal drainage
Keep airport drainage systems functional
Lake Drainage Board
Maintain functionality of airport drainage systems
Open cut drainage
Open ditch drainage
Open ditch draining
Open-channel drainage
Opening drainage
Postural drainage board
Postural drainage table
Prevent drainage systems in airports from overflowing
Saskatchewan Drainage Appeal Board
Sub-drainage
Subsurface drainage
Surf-board Windsurfer
Surface drainage
Tilt table
Yacht

Traduction de «Drainage board » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
postural drainage board [ postural drainage table | tilt table | drainage board ]

table inclinable pour le drainage postural


Lake Drainage Board

Organisme de droit public pour la gestion des lacs


Greater Vancouver Sewerage and Drainage District [ Vancouver and Districts Joint Sewerage and Drainage Board ]

Greater Vancouver Sewerage and Drainage District [ Vancouver and Districts Joint Sewerage and Drainage Board ]


open cut drainage | open ditch drainage | open ditch draining | open-channel drainage | opening drainage | surface drainage

drainage à ciel ouvert | drainage à fossé ouvert | drainage par canaux | drainage par fossé | drainage par fossés | drainage par fossés ouverts


ensure drainage system in airport remains functional | maintain functionality of airport drainage systems | keep airport drainage systems functional | prevent drainage systems in airports from overflowing

maintenir les systèmes de drainage d'un aéroport fonctionnels


drainage well systems commissioning | installing drainage well systems | drainage well system installing | install drainage well systems

installer des systèmes de puits de drainage


designing drainage well systems | drainage well systems specifying | design drainage well systems | drainage well system designing

concevoir des systèmes de puits de drainage


internal drainage | sub-drainage | subsurface drainage

drainage par conduites enterrées | drainage par drains | drainage souterrain


watercraft accidents in the course of recreational activities | Modifiers The following fourth-character subdivisions are for use with categories V90-V94: Code Title .0 Merchant ship .1 Passenger ship Ferry-boat Liner .2 Fishing boat .3 Other powered watercraft Hovercraft (on open water) Jet skis .4 Sailboat Yacht .5 Canoe or kayak .6 Inflatable craft (nonpowered) .7 Water-skis .8 Other unpowered watercraft Surf-board Windsurfer .9 Unspecified watercraft Boat NOS Ship NOS Watercraft NOS | Ferry-boat Liner | Hovercraft (on open water) Jet skis | Yacht | Surf-board Windsurfer | Boat NOS Ship NOS Watercraft NOS

accidents de bateau au cours d'activités de loisirs | Modificateurs Les subdivisions suivantes à quatre caractères s'appliquent aux catégories V90-V94: Code Titre .0 Navire marchand .1 Navire à passagers Ferry-boat Paquebot .2 Bateau de pêche .3 Autres embarcations à moteur Aéroglisseur Scooter des mers .4 Bateau à voiles Yacht .5 Canoë ou kayak .6 Canot pneumatique (sans moteur) .7 Ski nautique .8 Autres embarcations sans moteur Planche de surf Planche à voile .9 Embarcation non précisée Bateau SAI Embarcation SAI Navire SAI | Ferry-boat Paquebot | Aéroglisseur Scooter des mers | Yacht | Planche de surf Planche à voile | Bateau SAI Emba ...[+++]


Saskatchewan Drainage Appeal Board

Saskatchewan Drainage Appeal Board
TRADUCTIONS EN CONTEXTE
(4) Wells for purposes other than drainage shall not be constructed in the double bottom; the Board may exempt any ship from the requirements of this subsection in respect of any well it is satisfied will not diminish the protection given by the double bottom.

(4) Les puisards destinés à d’autres fins que l’asséchement ne seront pas établis dans les double-fonds. Le Bureau pourra exempter tout navire de l’obligation de se conformer au présent paragraphe relativement à tout puisard qui, à son avis, ne diminue pas la protection assurée par le double-fond.


(4) In every Class B ship over 22.9 m in length carrying more than 12 passengers, at least one of the power fire pumps shall be fitted with an automatic control whereby full pressure will be maintained on the fire mains at all times while passengers are on board excepting that where piping is liable to frost damage such piping may be maintained in a drained condition provided the shut-off valve and drainage cocks are located in a readily accessible location with a pressure gauge being installed on the drainable section of the piping i ...[+++]

(4) Sur tout navire de la classe B long de plus de 22,9 m et transportant plus de 12 passagers, au moins l’une des pompes d’incendie mécaniques aura une commande automatique permettant de maintenir en tout temps la pression dans les collecteurs pendant que des passagers seront à bord, mais si le gel risque d’endommager certains tronçons des conduites, ces tronçons peuvent être vidangés et demeurer dans cet état, à condition que la soupape d’arrêt et les robinets de vidange soient situés en un endroit facilement accessible et qu’un manomètre soit installé sur les tronçons vidangeables des conduites, juste à côté de la soupape d’arrêt.


w