Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assemble library lists
Car load
Cargo list
Carload
Compile library lists
Compiling library lists
Complete wagon load
Complete wagon-load
Freeboard load line
Full wagon load
Full wagon-load
LOT procedure
Legal load line
Line load control list
Line-load Phone Control Priority List
Load capacity
Load carrying capacity
Load line
Load line mark
Load on top
Load on top procedure
Load on top system
Load range
Load rating
Load waterline
Load-carrying capacity
Load-on-top
Load-on-top method
Load-on-top procedure
Load-on-top system
Loading lines
Loading list
Loadline mark
Maximum design tyre load
Maximum load capacity
Maximum load rating
Maximum load-carrying capacity
Put together library lists
Tire load capacity
Tire load rating
Tire rating
Wagon load

Traduction de «loading list » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
loading list

bulletin de chargement | feuille de chargement






tire load capacity | load rating | maximum load rating | load capacity | maximum load capacity | maximum load-carrying capacity | tire rating | load range | tire load rating | load carrying capacity | load-carrying capacity | maximum design tyre load

capacité de charge | capacité de charge maximale | limite de charge | capacité nominale | capacité nominale maximale | charge nominale | charge nominale maximale | limite de charge nominale | charge maximale calculée par pneumatique


Line-load Phone Control Priority List

Liste de priorité relative au contrôle de la charge des circuits téléphoniques




load on top [ load-on-top | load on top procedure | load-on-top procedure | LOT procedure | load-on-top system | load on top system | load-on-top method ]

chargement sur résidus [ système de chargement sur résidus | méthode de chargement sur résidus | load on top | chargement sur résidu | chargement par dessus | chargement par le dessus | chargé en dessus ]


assemble library lists | put together library lists | compile library lists | compiling library lists

dresser les listes de la bibliothèque


load line | loading lines | load line mark | loadline mark | freeboard load line | legal load line | load waterline

ligne de charge | ligne de flottaison en charge | marque de ligne de charge


complete wagon load | complete wagon-load | full wagon load | full wagon-load | wagon load | carload | car load

charge complète | wagon complet
TRADUCTIONS EN CONTEXTE
Documentation procedures : Companies should ensure that loading lists, manifests and/or other transport related documents are complete, legible, accurate and submitted in time.

Procédures documentaires: les entreprises doivent s’assurer que les listes de chargement, les manifestes et les autres documents de transport sont complets, lisibles, précis et présentés en temps voulu.


61 (1) Every subsea production system shall be designed to withstand major damage under the loads listed in Part B, Section 4, of Det norske Veritas Guideline No. 1-85, Safety and Reliability of Subsea Production Systems.

61 (1) Le système de production sous-marin doit être conçu pour résister à des dommages majeurs lorsqu’il est soumis aux charges énumérées à l’article 4, partie B, du document Guideline No. 1-85 du Det norske Veritas intitulé Safety and Reliability of Subsea Production Systems.


62 (1) Every subsea production system shall be designed to withstand major damage under the loads listed in Part B, Section 4, of Det norske Veritas Guideline No. 1-85, Safety and Reliability of Subsea Production Systems.

62 (1) Le système de production sous-marin doit être conçu pour résister à des dommages majeurs lorsqu’il est soumis aux charges énumérées à l’article 4, partie B, du document Guideline No. 1-85 du Det norske Veritas intitulé Safety and Reliability of Subsea Production Systems.


Materials that would not contribute significantly to a fire load shall be listed.

La liste des matériaux qui ne contribueraient pas de manière significative à la charge calorifique doit être établie.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
7 (1) The designed stress on the davit arms, when operating under maximum load and conditions of list, shall afford an adequate factor of safety having regard to the quality of the material used, the method of construction, and the live nature of the load to which the davits are subjected.

7 (1) La charge de calcul appliquée aux bras des bossoirs manoeuvrés dans les conditions maximums de charge et de bande devra assurer un coefficient de sécurité suffisant, compte tenu de la qualité des matériaux utilisés, du mode de construction et du fait que le poids appliqué aux bossoirs est un poids roulant.


The totals at the bottom of each port list relate to the total amount of all commodities sent from international ports. The totals do not reflect port activity overall because international loadings and domestic loadings and unloadings are not included.

Le total apparaissant au bas de la liste relative à chaque port représente la quantité totale de marchandises expédiées depuis des ports étrangers, mais non l’activité globale du port canadien puisque ce nombre ne tient pas compte des chargements étrangers ni des chargements et des déchargements intérieurs.


(Return tabled) Question No. 1123 Ms. Kirsty Duncan: With respect to the government’s position on chronic cerebrospinal venous insufficiency (CCSVI): (a) does the government track clinical trials on CCSVI currently being undertaken by other countries and, if yes, what are all clinical trials, identified by phase, currently being undertaken worldwide, (i) which countries are undertaking Phase lll trials; (b) does the government question whether CCSVI exists and, if yes, (i) why does the government not question whether treating CCSVI actually improves quality of life for Canadians with multiple sclerosis (MS); (c) how many cases of " major complications associated with venous angioplasty" have occurred in Canada and, if it is not possible ...[+++]

(Le document est déposé) Question n 1123 Mme Kirsty Duncan: En ce qui concerne la position du gouvernement par rapport à l’insuffisance veineuse cérébrospinale chronique (IVCC): a) le gouvernement surveille-t-il les essais cliniques effectués par d’autres pays et, si oui, quels sont tous les essais cliniques, identifiés par phase, effectués actuellement partout au monde sur l’IVCC, (i) quels pays ont effectué des essais de la phase III; b) le gouvernement met-il en doute l’existence de l’IVCC, et si oui, (i) pourquoi le gouvernement ne se demande-t-il pas si le traitement de l’IVCC améliore réellement la qualité de vie des Canadiens atteints de sclérose en plaques (SP); c) combien de cas de « complications majeures associées à l’angioplas ...[+++]


As trailers designed especially for abnormal load transport cannot meet all the provisions of the regulatory acts listed in Annex IV to Directive 2007/46/EC that are required to be complied with for the purpose of European type-approval, it is appropriate to include those trailers in the category of special purposes vehicles given their technical features.

Comme les remorques spécifiquement conçues pour le transport de charges exceptionnelles ne peuvent pas satisfaire à toutes les dispositions des actes réglementaires cités à l'annexe IV de la directive 2007/46/CE et devant être respectées aux fins de la réception par type européenne, il convient de les inclure dans la catégorie des véhicules à usage spécial, étant donné leurs caractéristiques techniques.


2. The list of load-capacity indices and their corresponding masses contained in UNECE Regulations 30 and 54 shall apply.

2. La liste des indices de capacité de charge et de leurs masses correspondantes figurant dans les règlements CEE-ONU 30 et 54 s’applique.


Content of the national legislation: UN 0431 and UN 0503 may be loaded together with certain dangerous goods (products related to car manufacturing) in certain amounts, listed in the exemption.

Contenu de la législation nationale: les numéros ONU 0431 et ONU 0503 peuvent faire partie du même chargement que certaines marchandises dangereuses (produits de construction automobile) dans des quantités données, énumérées dans cette exemption.




datacenter (1): www.wordscope.fr (v4.0.br)

'loading list' ->

Date index: 2024-01-28
w